The Story of a Dream Basement in El Paso, Colorado: Why Our Client Chose to Plan the Work Before the Holidays (and Start in January)
- Right Way Construction

- Nov 25
- 3 min read
From Idea to Execution: An Exclusive Project in El Paso, Colorado
At Right Way Construction, planning is everything, especially when it comes to luxury transformations in Colorado. Most homeowners wait until the spring season is around the corner to start thinking about their big projects, only to discover that planning and permits take months.
However, our client, whom we will call Ms. C, made a brilliant decision this fall: to move forward with the planning of her luxury basement. Instead of waiting until January for the initial consultation, Ms. C wanted all the design and engineering ready now, in November and December, so the construction team could begin execution at the beginning of 2026.
This is the story of how a strategic calendar is guaranteeing her a luxury basement without delays.
Phase 1: The Meetings — Defining the Layout
When Ms. C contacted us in October, her basement was an open canvas, but it presented the classic Colorado challenges: the need for impeccable climate control and lighting that didn't feel "subterranean."
"She wanted more than just divisions," our team commented. "She envisioned a true personalized space: bedrooms, a work area, a spacious room to enjoy TV with her family, a bar area, and plenty of outlets. The challenge was ensuring the layout felt cozy yet functional."
In this first stage of Strategic Layout, our team worked to define the "bones" of the project, ensuring that every subterranean square footage maximized functionality and the value of her investment, before drawing the first room.

Phase 2: When the Design Magic Comes to Life
If the project execution starts in January – February, the design and visualization must happen now. This is where Ms. C’s decision to move the timing forward was key:
💡 The Art of Detailed Records
In these crucial weeks of November, our focus has been on detailing every finish. This includes:
Detailed Blueprint: We leave nothing to the imagination. The detailed blueprints guarantee Ms. C that every inch of her home will be distributed according to her style. This prevents costly changes halfway through the project.
Lighting as a Priority: We apply the same logic as in our last article: lighting is the invisible layer. We have designed specific light circuits (5000K in the work area and 2700K dimmable in the cinema area) so that each space fulfills its function and its promise of luxury.
Selection of Luxury Materials: We will soon begin with the selection of finishes and custom furniture. By doing this in these months, we ensure that the materials will be on the job site in January, eliminating common supply chain delays.
Phase 3: The Reward of Planning — Execution in January
By the time the end-of-year holidays arrive, the Right Way Construction team will have:
The Final Design Approved by the client.
The Specifications approved.
Construction Permits requested and, ideally, approved.
Key Materials ordered or with confirmed delivery dates.
Thanks to this strategic approach, Ms. C will avoid the project congestion that occurs every spring and will have an organized and stress-free start to construction at the end of January in her beautiful home located in El Paso, Colorado. She will have a new luxury sanctuary before most people have even started thinking about calling a contractor.

Are You Ready to Plan Your Masterpiece?
The Right Way Construction process is not just about building; it's about designing on time. If you dream of a large project (basement, kitchen, or full renovation) in 2026, the initial conversation must be now. Don't wait for spring.
Contact us today to schedule your initial consultation and plan the start of your work for early 2026.
Be like Ms. C and guarantee a stress-free and delay-free project!